输变电设备生产基地 Electric Transmission and Transformation Equipment Manufacturing Base

2007-07-03 14:22:06
华夏经纬网

1、项目名称:输变电设备生产基地。

2、项目建设主要内容及投资规模:项目征地50万平方米,建设厂房、办公楼、生产车间及公辅设施。年变压器产量3000KVA,包括10KV35KV110KV220KV500KV级,其中500KV及以上变压器产量2000KVA。项目总投资估算20亿元,其中固定资产投资18亿元,流动资金2亿元。

3、建设必要性:根据国家电网公司十一五电网规划及2020年远景目标,十一五期间,国家电网公司将新增330千伏及以上输电线路6万千米、变电容量3亿千伏安,投资额9600亿元,另外南方电网公司的投资额预计在3000亿元。国家电网公司和南方电网公司合计总投资额将在12600亿元左右。到2010年,我国跨区输电能力将达到4000多万千瓦、输送电量1800多亿千瓦时。输变电设备行业面临很好的发展前景。

4、经济效益分析:项目建设期3年,达产后预计年可实现销售收入25亿元,利润2亿元,税金1.5亿元。

5、希望合作者(投资者)具备的条件:有高压变压器生产技术,有资金实力。

6、合作方式:独资、合资或合作。

7、地理位置、交通运输及通讯:该项目位于营口沿海产业基地,交通便利、通讯设备完善。

 

联系方式

1、单位名称:辽宁(营口)沿海产业基地

2、地    址:辽宁(营口)沿海产业基地新连大街东1

3、邮政编码:115003

4、联 人: 

5、电    话:0417-2927809

6、传    真:0417-2927810     

7、电子邮箱:wyyks @sohu.com

 

1 Project Name: Electric Transmission and Transformation Equipment Manufacturing Base

2 Main Contents and Investment Scale: The project will purchase the land area of 500 thousand square meters to conduct working building, office building, production department and public auxiliary facilities. The annual output of transformer is 30 million KVA including 10KV, 35KV, 110KV, 220KV and 500KV, of which the output of 500KV and above transformer is 20 million KVA. The estimated total investment is RMB 2 billion Yuan, among which fixed asset investment is RMB 1.8 billion Yuan and circulating fund is RMB 0.2 billion Yuan.

3 Construction Necessity: According to “Eleventh Five Years” power network plan of State Grid Corporation of China and the prospect of the long-term target in 2020, The State Grid Corporation of China will increase above-330kv power lines by 60 thousand kilometers so as to realize a transform capacity of 300 million KV-amperes. The total investment will have reached RMB 960 billion Yuan. In addition, the total investment by State Grid Corporation of China and China Southern Power Grid Co., Ltd will add up to about RMB 1260 billion Yuan. By the year of 2010, the trans-regional power exchange will reach 40 million KW with a total power transmission volume of 180 billion KWH. The state industrial planning has brought a promising prospect for the power transmission and transformation manufacturing.

4 Economic Benefit Analysis: The construction period of project is three years. After the project reaches its designed production capacity, the estimated annual sales income is RMB 2.5 billion Yuan, profit is RMB 0.2 billion Yuan and tax is RMB 0.15 billion Yuan.

5 Qualifications for Cooperators or Investors: Cooperators or investors should have production technology of high voltage transformer and powerful capital strength.

6 Form of Investment: Sole investment, Joint venture or Cooperation

7 Geographic Location, Traffic and Transportation and Communication: The project is located in Yingkou Coastal Industry Base with convenient traffic and perfect communication equipment. 

Contact Us

1 Name: Liaoning (Yingkou) Coastal Industry Base

2 Address: No.1 East Xinlian Street, Liaoning (Yingkou) Coastal Industry Base

3 Postcode: 115003

4 Contact Person: Wang yong

5 Telephone: 0417-2927809

6 Fax: 0417-2927810      

7 E-mailwyyks @sohu.com

  
发表感言