年产100台兆瓦级风力发电机组 100 units/year of MW Wind Turbine-Generator

2007-07-03 14:27:19
华夏经纬网

1、项目名称:年产100台兆瓦级风力发电机组。

2、项目主要内容及投资规模:项目征地70000平方米,建设厂房等15000平方米。购置加工、铸造、检测设备等。年产兆瓦级(1.5兆瓦、2兆瓦)风电机组100总投资2.5亿元,其中固定资产投资2亿元,流动资金5000万元。

3、建设必要性: 2020年,中国风电装机容量将达到3000万千瓦,需要兆瓦级的风电机组2—3万台,平均每年的市场容量达100亿元人民币。特别是国家发改委提出,未来装机的风能发电机要实现50% 70%的国产化率,这为风电设备国产化提供了广阔的市场发展空间和政策保障。

4、经济效益分析:项目建成后,预计年可实现销售收入7亿元,利润1亿元元,税金8000万元。

5、希望合作者(投资者)具备的条件:掌握兆瓦级风电机组生产技术,有一定资金实力。

6、合作方式:独资、合资或合作。

7、地理位置、交通运输及通讯:该项目位于营口沿海产业基地,交通便利、通讯设备完善。

 

联系方式

1、单位名称:辽宁(营口)沿海产业基地

2、地    址:辽宁(营口)沿海产业基地新连大街东1

3、邮政编码:115003

4、联 人: 

5、电    话:0417-2927809

6、传    真:0417-2927810     

7、电子邮箱:wyyks @sohu.com 

 

 

1 Project Name: 100 units/year of MW Wind Turbine-Generator

2 Main Contents and Investment Scale: The project purchases land area of 70 thousand square meters, construct factory building with the area of 15 thousand square meters and purchases equipment such as processing, casting and detection device etc.. The annual output of MW (1.5MW, 2MW) wind turbine group is 100 units. The total investment is RMB 0.25 billion Yuan, among which fixed asset investment is RMB 0.2 billion Yuan and circulating fund is RMB 50 million Yuan.

3 Construction Necessity: Wind Energy Installed Capacity of China will reach 30 million KW by 2020. It needs MW (1.5MW, 2MW) wind turbine group of twenty to thirty thousand units. The average annual market capacity will reach RMB 10 billion Yuan. In particularly, as the National Development and Reform Commission issues the goal that wind power generator installed in the future will achieve the home-made rate of 50% to 70%, it will provide a wide development space and policy guaranteeing for the localization of wind power equipment.

4 Economic Benefit Analysis: After the project is completed, the estimated annual sales income is RMB 0.7 billion Yuan, profit is RMB 0.1 billion Yuan and tax is RMB 80 million Yuan.

5 Qualifications for Cooperators or Investors: Cooperators or investors should master production technology of MW wind turbine group and have powerful capital strength.

7 Form of Investment: Sole investment, Joint venture or Cooperation

8 Geographic Location, Traffic and Transportation and Communication: The project is located in Yingkou Coastal Industry Base with convenient traffic and perfect communication equipment. 

Contact Us

1 Name: Liaoning (Yingkou) Coastal Industry Base

2 Address: No.1 East Xinlian Street, Liaoning (Yingkou) Coastal Industry Base

3 Postcode: 115003

4 Contact Person: Wang yong

5 Telephone: 0417-2927809

6 Fax: 0417-2927810      

7 E-mailwyyks @sohu.com

  
发表感言