2万吨/年(50%)过氧化氢 20,000 Tons/year (50%) of Hydrogen Peroxide

2007-07-03 15:00:10
华夏经纬网

1、项目名称:2万吨/年(50%)过氧化氢。

2、项目主要内容及投资规模:工厂占地约2万平方米,年产2万吨(50%)过氧化氢装置,项目估算总投资12685万元,其中建设投资12000万元。

3、建设必要性:过氧化氢具有无污染的特征,被称为最清洁的化工产品。近年来,过氧化氢是全球工业化学品中增长最快的产品之一,具有很好的经济效益。

4、经济效益分析及市场前景预测:年销售收入为7000万元,税前内部收益率为21%

5、投资方式:合资或独资。

6、地理位置、交通运输及通讯:项目位于葫芦岛北港工业区,交通便捷,通讯设施完善。

7、双方提供的投资条件及投资比例:提供资源条件及配套条件。

8、拟引进技术设备:引进资金及设备。

9、项目前期工作进展情况:已完成前期规划工作。

10、项目建设期及投资回报期:建设期两年,静态投资回收期6年。

 

联系方式

    称:葫芦岛北港工业区管委会

    址:辽宁省葫芦岛市龙港区龙程路 

邮政编码:125003

人:   强、李          

    话:0429- 20788882078038

    真:0429-20790222078827

电子邮箱:2132962@sina.com   zhongyin114@hotmail.com

 

1. Project Name: 20,000 Tons/year of Hydrogen Peroxide (50%)

2. Main Contents and Investment Scale: With the production capacity of hydrogen peroxide advice of 20,000 tons (50%), the factory covers around 20,000 m2. The total investment is estimated to be 126.85 million RMB Yuan in which the construction investment is 120 million RMB Yuan.

3. Necessity of Construction: Hydrogen peroxide has the character of non-pollution. Therefore, it is reputed as the “the most clean” chemistry product. In recent years, hydrogen peroxide has become one of the industrial chemicals with the most rapid development globally and has very good economic benefit. 

4. Economic Benefit Analysis and Market Prospect Estimate: The annual sales income is 70 million RMB Yuan with the internal rate of return before tax of 21%.

5. Form of Investment: Joint venture or Wholly-funded proprietorship.

6. Geographic Position, Transportation and Communication: The project is located in the Huludao North Island Industry Zone which has efficient traffic and consummate communication facilities.

7. Investment Condition Provided by Both parties and Ratio of Investments: Provide resource conditions and matching conditions.

8. Techniques and Equipments Planned to Be Introduced: Capital and equipments.

9. Previous Working situation of Project: Previous planning work has been completed.

10. Construction Period and Payback Period of Investment of Project: 2-year construction period and 6-year discounted payback period of investment.    

 

Contact Us:

Name: Management Committee of Huludao North Harbor Industry Zone

Address: Longcheng Road, Longgang District, Huludao City, Liaoning Province

Code: 125003

Contact: Wu Qiang, Li Bing 

Phone: 0429-2078888, 2078038

Fax: 0429-2079022, 2078827

E_mail: 2132962@sina.com  Zhongyin114@hotmail.com

  
发表感言