1、项目名称:年产10亿只环保纸模餐饮具、食品包装、工业包装和日用品基地。

2、项目主要内容及投资规模:项目计划总投资6500万元,占地面积8000平方米。

3、建设必要性:目前,中国仅有年产80亿只纸模等环保餐饮具的生产能力,而用于替代一次性发泡塑料餐具和超市托盘等不可降解的产品,每年需量在250亿只以上。其他食品包装、工业品包装和绿色环保日用品的市场需量更是不可预测。

4、经济效益分析及市场前景预测: 项目达产后年总产值可达8692万元,年纯利润1740万元。

5、投资方式:独资、合资、合作。

6、地理位置、交通运输及通讯:项目拟建在丹东产业园区,丹东市铁路可直通国内主要城市,交通便利、通讯发达,水电供应充足。

7、双方提供的投资条件及投资比例:投资双方洽谈后决定。

8、拟引进技术设备:购置模具加工中心、激光切割(打孔)机等精密加工设备;引进新一代节能加热元器件等加热设备;购置新型环保设备,应用阻隔式工艺取代在原材料中加入阻油剂、阻水剂工艺;购置三条工业包装专用生产线设备和两条西餐多格盘等专用生产线设备。

9、项目前期工作进展情况:丹东产业园区已完成土地回填,实现三通一平。

10、项目建设期及投资回收期:项目建设期为1年,投资回收期4年。

联系方式

    位:辽宁丹东产业园区管委会

    址:丹东市滨江中路128号太阳大厦A2104-2107

人:刘泽程

联系电话:0415-61997116166911

传真电话:0415-6199811

    箱:E-mail:lzc0909sina.com

 

 

1. Name of Project: 1 Billion Pieces/year of Environmental-Friendly Paper Mould Tableware, Food Package, Industrial Package and Daily Use Base

2. Project Main Content and Investment Scale: The planned total investment of the project is 65,000,000 Yuan, and the floor area 8000 square meters.

3. Necessity of Construction of the Project: At present, the production capacity of the environmental-protection type paper tableware in China is only 8 billion pieces per year. But more than 25 billion pieces of products that are not nondegradable such as the disposable expanded plastic tableware and serving tray in supermarket are needed to be replaced every year. The demand of the other food packaging, industrial products package and environmental protection type commodity in the market is immeasurable.

4. Economic Analysis on Benefit and Market Prospect Forecast: After completing the project, the annual gross output value will be up to 86,920,000 Yuan, and the annual net profit will be 17400,000 Yuan.

5. Form of Investment: Wholly-funded, joint venture, and cooperation.

6. Geographical Position, Traffic and Transportation and Communication: The project is planned to be built in Dandong Industrial Zone. The railways of Dandong City can reach directly the main cities in China. The city has the convenient traffic, perfect communication and enough water and electricity supply.

7. Investment Condition and Ratio of Investments Provided by both Parties: It is determined after both parties of investment consult with each other.

8. Technology and Equipment to be Introduced in Plan: Purchase the precision processing equipment, such as mould processing center, laser cutting (laser drilling) machine, etc.; Introduce new generation of the heating equipment such as the energy saving heating parts. Purchase new type environmental protection equipment; Utilize the obstructing type technology to replace the technology of adding the anti oil agent and the anti water agent into the raw material: Purchase three production lines and the equipment special for industrial packaging and two production lines and equipment special for the multi grid dish of Western-style food, etc.

9, The Progress of Work in the Earlier Stage of the Project: Dandong Industry Zone has completed the work of the land back-filling, and has had supply of water, electricity and road and leveled ground.

10, Project Construction Period and Repayment Period of Investment: The project construction period is 1 year and the repayment period of investment is 4 years.

Contact us:

Unit: Dandong Industrial Zone Administration Committee of Liaoning Province

Address: Room 2104-2107, Building A, Taiyang Building, No. 128, Binjiang Middle Road, Dandong City

Contact Person: Liu Zecheng

Telephone: 0415-6199711, 6166911

Fax: 0415-6199811

E-mail:lzc0909sina.com

  
发表感言